ATV / UTV Registrations
Registrations expire March 31 annually
2017 2018 2019 2020 2021
2022 (*)
ATVs 315,094
319,117 321,217 327,980 331,946 322,186
UTVs 61,517 76,204 91,517 113,367 134,745 144,178
TOTAL
376,611 395,321
412,734 441,347 466,691 466,364
(*) As of 8/15/22
Registered Vehicles
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
2017 2018 2019 2020 2021 2022 (*)
Registered ATVs and UTVs in Wisconsin
UTVs ATVs
Non-Resident Trail Pass Sales
2017 2018 2019 2020 2021 2022 (*)
5-Day Pass 5,651 5,968 6,196 7,205 7,800 3,480
Annual Pass 13,667 14,637 16,268 21,829 22,888 18,792
TOTAL
19,318 20,605 22,464 29,034 30,688 22,272
(*) As of 8/15/22
Non-Resident Trail Pass Sales
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2017 2018 2019 2020 2021 2022 (*)
NR Trail Pass Sales
5-Day Pass Annual Pass
REGISTRATION REVENUES & EXPENDITURES
Continuing Balance Continuing Balance
June 30, 2021 June 30, 2021
Unobligated Balance
$7,186,793 Unobligated Balance $344,113
Encumbered-Unpaid Grant Obligations $3,689,071 Federal Funds balance ($48,644)
Adjustment of FY 2021 Preliminary to FY 2021 Actual $361,757 Encumbered-Unpaid Grant Obligations $1,951,077
Total Continuing Balance into FY2022 $11,237,622 Adjustment of FY 2021 Preliminary to FY 2021 Actual $100,178
Total Continuing Balance into FY2022 $2,346,723
FY 2022 Revenues FY 2022 Revenues
ATV PUBLIC REGISTRATION
$3,415,092 Gas Tax Formula ATV $2,529,404
ATV PRIVATE AGRICULT REGISTRAT $21,105 ATV Safety Course Fees $24,399
ATV PRIVATE REGISTRATION $76,500
Gas Tax Formula UTV $814,941
ATV/UTV DEALER REGISTRATION $14,310 TOTAL REVENUES COLLECTED $3,368,744
ATV REPLACEMENT CERTIFICATE
$5,940 TOTAL FY2022 CONTINUING BALANCE AND REVENUES $5,715,467
ATV REPLACEMENT DECALS
$7,685
ATV/UTV DEALER DECAL $13,440
ATV MUNICIPAL REGISTRATION $270
PRIVATE ATV REPLACEMENT DECALS $425
NON RESIDENT ATV/UTV TRAIL $766,537
ATV Ownership Transfer Fees $79,090
5-DAY ATV TRAIL PASS $147,621
ATV DNR REGISTRATION $0
Late ATV Renewal Fee $128,106
ATV/UTV DEALER REPLACE DECAL $80
UTV PUBLIC REGISTRATION $2,165,461
UTV MUNICIPAL REGISTRATION $460
UTV PRIVATE REGISTRATION
$47,865
UTV PRIVATE AGRICULT REGISTRAT $49,215
UTV REPLACEMENT DECALS $7,685
UTV REPLACEMENT CERTIFICATE $4,895
UTV TRANSFER FEE $46,739
PRIVATE UTV REPLACEMENT DECALS $955
PENDING ATV/UTV $1,589
Refund of Prior Year Expense $2,116
Interest Distributions ($12,238)
($13,059)
Other Agency $335
TOTAL REVENUES COLLECTED $6,978,217
TOTAL FY 2022 CONTINUING BALANCE AND REVENUES $18,215,839
FY 2022 Expenditures FY 2022 Expenditures
County Trail Maintenance - ATV $245,336 County Trail Maintenance ATV - Gas Tax $1,915,136
County Trail Grants $2,116,951 County Project - ATVGas Tax $735,397
County Trails - UTV $0 County Trails - UTV Gas Tax
$602,990
State Trail Maintenance - ATV $419,279 Law Enforcement and Safety $4,425
State Trail Grants $158,121
Law Enforcement and Safety $1,386,700
County Law Enforcement Aids $750,000 TOTAL EXPENDITURES $3,257,949
nt - 961 OFF_R
Aids Admin-ATV Admin $926,132
Aids Admin-Council $2,568 Unpaid Grant Obligations $2,273,655
State Trail Maintenance - UTV $0
Administrative Services $516,143 TOTAL OBLIGATIONS $2,273,655
DOA Charges $335 TOTAL EXPENDITURES AND OBLIGATIONS $5,531,603
TOTAL EXPENDITURES $6,521,566
PRELIMINARY BALANCE AS OF JUNE 30, 2022 $183,864
Unpaid Grant Obligations $2,997,068
Adjustment $0 PENDING GRANTS APPROVED BY COUNCIL $0
TOTAL OBLIGATIONS $2,997,068
TOTAL EXPENDITURES AND OBLIGATIONS $9,518,634
***PRELIMINARY ADJUSTED PROGRAM BALANCE
$183,864
PRELIMINARY BALANCE AS OF JUNE 30 ,2022 $8,697,205
PRELIMINARY ADJUSTED REGISTRATION & ASSIGNED PROGRAM BALANCE
$8,881,069
PENDING GRANTS APPROVED BY COUNCIL $0
Landowner Incentive Program Lapse ** $0
***PRELIMINARY ADJUSTED PROGRAM BALANCE
$8,697,205 February 28, 2021 Registrations (Gas Tax FY21 Revenue) 354,868
June 30, 2022 Total Registrations/Renewals during FY22 115,697
June 30, 2022 Total Active Registrations 458,797
June 30, 2022 Total Annual Trail Passes Sold 22,008
*** These are Separate Accounts that CANNOT be Combined June 30, 2022 Total 5-Day Passes Sold 7,485
ASSIGNED SEGREGATED REVENUES & EXPENDITURES - GAS TAX
Only County Trail Maintenance and County Projects can be
funded from either Registration or GAS tax revenue. All
other expenditures must be funded from the dedicated
revenue source.
Appn 57600 Appn 57700 Appn 54800
Appn 54700 Total
Prior year unused (FY21): 129,583.37$ 1,209,179.56$ -$
-$
1,338,762.93$
Current year gas tax (FY23): 2,890,440.08$ -$
2,890,440.08$
Current year Chapter 20 (FY23): 2,515,600.00$ -$ 2,515,600.00$
Maintenance (FY23): ($2,551,147.63) (2,551,147.63)$
Avalaible for Development per Chapter 20 in FY23 468,875.82$ 3,724,779.56$
-$ -$
4,193,655.38$
Prior Year Gas Tax (FY 22 carryover) 129,583.37$
Current Year Gas Tax (FY23) 2,890,440.08$
Registration Revenue Avaliable From FY22 8,697,205.31$
Maintenance FY23 (2,551,147.63)$
Funds Avaliable for Development (FY23) 9,166,081.12$
Chapter 20 Maximum Available for Development (FY23) 4,193,655.38$
ATV revenue; not available for awards 4,972,425.75$
ATV Funding Avaliable 2022-2023 (FY23)
ATV Development Avalaible Based on Revenue
Rates for 2022-23 season Existing Proposed 22 DOT Jan 22 DOT May
22 DOT Aug
Class Description Rate Rate
101 All trucks pickups 15.00 16.00 14.66 15.36
16.04
105 All trucks single axle, dual tire over 26,000-pounds 50.00 56.00 42.20 60.12
62.76
128 All Trucks, tandem, tri, quad axle 55.00 60.00
59.80
62.68
65.45
203 All Tired tractors & All skidsteers up to 49 hp 23.00
28.00
30.08 31.54 32.92
205 All Tired tractors & All skidsteers 50-99 hp 32.00 33.00
31.20 34.79 34.16
206 All Tired tractors & All skidsteers 100-150 hp 47.00
43.00 35.16 42.78
38.48
207 All Tired tractors & All skidsteers 150 hp and up 59.00 52.00
40.82 44.66
215 All Tracked tractors & Dozers up to 99 hp 44.00 48.00 46.02
49.32 51.50
217 All Tracked tractors & Dozers 100-149 hp 47.00 53.00 53.04 55.60 58.06
218
All Tracked tractors & Dozers 150 hp and up
76.00 82.00
79.26 83.08 86.74
401 Air compressor all types 14.00
14.00
14.28 14.28
410
Motorized mower over 23" / includes pull behind mowers
14.00 15.00 14.22 14.90 15.56
413 Mower—tractor mounted 15.00 16.00
15.90 15.90 15.90
414 Sickle attached to power unit 16.00
16.00 15.18 15.18
15.18
490 Trailer less than 1 ton (use mfr. rated capacity) 10.00 11.00
11.84 11.84 11.84
491 Trailer 1-4 tons (use mfr. rated capacity)
14.00 15.00
14.92
14.92 14.92
493 All Trailers over 4 ton 21.00 26.00 22.00 31.20 31.20
550 Rubber tired Backhoe (80 HP and over) was # 250 50.00 55.00
55.38 58.06 60.62
555 Excavator Track type (less than 100 HP)
45.00
48.00 46.92 49.18
51.36
558 Excavator Track type ( 100 - 149HP) 49.00 52.00 49.16 51.54 53.80
559 Excavator Track type (150HP and over) 61.00 65.00
63.04 66.08 68.98
802 Portable electric generator (all types) 16.00
18.00
20.44 21.42
902 Chipper self contained (25 HP and over) 30.00 33.00 33.22 34.82 36.36
914 Chain Saw, pole saw,power pruner,brush saw,weed eaters 6.00
6.50
7.00
914T Trailblazer brush cutter (attachment) 10.00 10.50 11.00
915 Auger (attachment for tractor/ skid steer),post pounder-hyd. 30.00 32.00 32.58 32.58
32.58
916 Hand-held motorized post-hole digger 12.00 13.00 13.00
919
Disc/spring tooth harrow/cultimulcher/cultipacker/rototiller
12.00 11.00 10.84 10.84 10.84
922 Welder 3.00 4.00 6.00
932
Brush Cutter - hydraulic driven ( include fecon head)
28.00 30.00 30.84
30.84 30.84
940 Brush Cutter—PTO driven 21.00 23.00 21.46 22.50 23.50
953 Boom for brush cutter 15.00 15.50 16.00 16.00 16.00
9042 Gas drill 6.00 5.00
4.00 4.00
9145 Snowmobile/ATV/UTV 19.00 19.00 19.34 19.34
9152 Stump Grinder (all) hydraulic/self powered 34.00 36.00 30.44 37.52
9205
Rear blade/box scraper/pull behind grader/packing pan/class1 drag
7.00 8.00 8.08 8.08
9406 PTO Driven chipper 22.00 25.00 27.22 27.22
Labor 8.00 9.00
Equipment and Labor Rates for 2022-23 Season
Adopted by Snowmobile Recreation Council & Off-Road Vehicle Council
Last Revised: 10/07/2022 1:05:09 PM
I.
SNOW TRAIL GROOMING EQUIPMENT RATES - All rates include power unit, grooming drag & operator(s).
Class
Description
Rate/Hour
AAA
All heavy duty tracked units constructed specifically for snow grooming with a minimum of 150
horsepower and capable
of pulling on a sustained basis a hydraulically operated grooming
d
rag of at least 7’6” (90 inches) frame width.
OR
A
ll fully tracked agricultural tractors with a minimum of 125 horsepower
.
OR
Trucks: minimum 1
-ton (4-wheel drive), minimum payload of 3,500 lbs., fully-tracked with a
minimum manufactured 15,000 GWV track system.
$5 more than AA
AAA1 - $100
AAA2 - $90
AAA3 - $80
AAA4 - $70
AA
All heavy duty tracked units constructed specifically for snow grooming having between 149 -
106 horsepower
and capable of pulling on a sustained basis a hydraulically operated
g
rooming drag of at least 7’6” (90 inches) frame width.
OR
A
ll fully tracked agricultural tractors with 106 124 horsepower
.
$5 more than A
AA1 - $95
AA2 - $85
AA3 - $75
AA4 - $65
A
All wheeled or half-track agricultural tractors with all-wheel drive, minimum of 105 horsepower
and capable
of pulling on a sustained basis a hydraulically operated grooming drag of at
l
east 7’6” (90 inches) frame width.
A1 - $90
A2 - $80
A3 - $70
A4 - $60
1
Drag is a minimum of 116” (138 inches) frame width with a minimum weight of 4,000
pou
nds and a length of at least 20 feet including snow packing pan but excluding
the tongue.
Wings that fold
down outside the
main frame do not
increase the drag
width for funding
purposes. Class is
based on static
frame dimensions.
2
Drag is a minimum of 96” (114 inches) frame width with a minimum weight of 3,000
pou
nds and a length of at least 18 feet including snow packing pan but excluding the
tongue
.
3
Drag is a minimum of 76” (90 inches) frame width with a minimum weight of 2,000
pou
nds and a length of at least 18 feet including snow packing pan but excluding the
tongue.
4
Drag is a minimum of 7’6”
(90 inches) frame width.
B
All medium duty (including pick-up trucks) tracked units constructed or adapted specially
f
or snow grooming and capable of pulling on a sustained basis a grooming drag 5’10” to
7
5” (70-89 inches) frame width.
OR
All
wheel type agricultural tractors with all-wheel drive or four- wheel drive assist with a
range of 65
-104 horsepower.
$50.00
C
All light duty power units constructed or adapted for snowmobile trail grooming and capable
of pu
lling on a sustained basis a grooming drag 4’ to 5’9” (48-69 inches) frame width.
E
xamples of the class of power units would include: ATVs/UTVs and snowmobiles. This class
also includes all equipment not addressed in other classes.
$35.00
Notes regarding correct rates for grooming equipment:
1.
A Class A power unit pulling either an 11’6” or 9’6” grooming drag that does not meet the specifications for either 1, 2 or 3
drags will be placed at level 4 for rate purposes.
2.
A Class A power unit not pulling a 7’6” grooming drag will be placed in Class B for rate purposes.
3. A Class B power unit not pulling a 5’10” grooming drag will be placed in Class C for rate purposes.
4. A power unit will not be placed in a higher class if it pulls a larger grooming drag than specified for the class.
5. Modifications to the drag must maintain original cutting and packing function as designed. Modifications made
outside the main frame will not increase the funding class.
6. Those winged drags that were previously funded and met the specifications as stated prior 2022-23 season may
continue to be funded at their previous classification (drag dimensions included) for a period of 10 years (through
2031-32)
7. Groomer time spent traveling on a route that is an integral part of a single funded trail may be funded at a rate of
50% of the assigned groomer rate, as non-grooming transport time. DNR will determine if route is integral to the
funded trail.
Equipment and Labor Rates for 2022-23 Season
Adopted by Snowmobile Recreation Council & Off-Road Vehicle Council
Last Revised: 10/07/2022 1:05:09 PM
II NON-GROOMING MAINTENANCE LABOR AND EQUIPMENT RATES A
MAINTENANCE LABOR (For other than trail grooming)
A labor rate of $9.00 per hour maximum is established for all non-grooming labor performed under the
maintenance agreement by snowmobile clubs and or other similar organizations with the sponsoring county.
Maintenance will generally include mowing and brushing, sign and post replacement, plowing of parking lots and
roads, shelter and toilet maintenance and normal repair and replacement of structures and facilities.
The allowable labor rate for county employees and others included in labor contracts will be as specified by
contract.
B EQUIPMENT RATES (For other than trail grooming)
The following schedule is based on frequently used pieces of equipment for non-grooming maintenance. The
Department of Transportation rates are considered when these rates are reviewed each year.
Equipment rates for pieces of equipment not found on this list will be found in the DOT rates. Unless specified
otherwise, these rates for equipment are based on hourly use. These rates do not include the operator. Where
the Department of Transportation issues rates that reflect an adjustment due to fuel rates, these rates shall be
the rates utilized for the season
.
Class
Description
Rate
101
All trucks pickups
$16.00
105
All trucks single axle dual-tire over 26,000 lbs.
$56.00
128
All Trucks, tandem, tri, quad axle
$60.00
203
All Tired tractors & All skid-steers up to 49 hp
$28.00
205
All Tired tractors & All skid-steers 50-99 hp
$33.00
206
All Tired tractors & All skid-steers 100-149 hp
$43.00
207
All Tired tractors & All skid-steers 150 hp and up
$52.00
215
All Fully Tracked tractors & dozers up to 99 hp
$48.00
217
All Fully Tracked tractors & dozers 100 - 149 hp
$53.00
218
All Fully Tracked tractors & dozers 150 hp and up
$82.00
401
Air compressor all types
$14.00
410
Motorized mower over 23" (self-contained or pull behind)
$15.00
413
Mowertractor mounted
$16.00
414
Sickle attached to power unit
$16.00
490
Trailer less than 1 ton (use mfr. rated capacity)
$11.00
491
Trailer 1-4 tons (use mfr. rated capacity)
$15.00
493
All Trailers over 4 ton
$26.00
550
Rubber tired Backhoe (80 HP and over) was # 250
$55.00
555
Excavator Track type (less than 100 HP)
$48.00
558
Excavator Track type ( 100 - 149HP)
$52.00
559
Excavator Track type (150HP and over)
$65.00
802
Portable electric generator (all types)
$18.00
902
Chipper self-contained (minimum 25 hp)
$33.00
914
Chain Saw, pole saw, power pruner, brush saw, weed eaters
$6.50
914T
Trailblazer brush cutter (attachment)
$10.50
915
Auger (attachment for tractor/ skid steer), Post pounder-hydraulic
$32.00
Equipment and Labor Rates for 2022-23 Season
Adopted by Snowmobile Recreation Council & Off-Road Vehicle Council
Last Revised: 10/07/2022 1:05:09 PM
916
Hand-held motorized post-hole digger
$13.00
919
Disc/spring tooth harrow/cultimulcher/cultipacker/rototiller
$11.00
922
Welder
$4.00
932
Brush Cutter - hydraulic driven/Fecon head
$30.00
940
Brush CutterPTO driven
$23.00
953
Boom for brush cutter
$15.50
9042
Gas drill
$5.00
9145
Snowmobile/ATV/UTV
$19.00
9152
Stump grinder (all) hydraulic/self powered
$36.00
9205
Rear blade/box scraper/pull behind grader/packing pan/rollers
$8.00
9406
Chipper, PTO driven
$25.00
ATV Summer Supplement
Adopted by the Off Road Vehicle Advisory Council
Spring/Summer/Fall Trail Grooming Drags
Class
Description
Rate Per Hour
Class I
Drag is a minimum of 76” in frame
width with a minimum length of at
least 16’ excluding the tongue. Drag
contains at least 2 sets of replaceable
cutting blades
$11.00
Class 2
Drag is a minimum of 76” in frame
width
$9.00
Example of Class 1 Drag
Total
County/State
Summer
ATV Miles
Summer ATV
x $600
Summer
UTV Miles
Summer UTV
x $200
SHARED
Winter ATV
Miles
SHARED
ATV Winter
x $100
No Snowmo
ATV Winter
Miles
No Snowmo
Winter ATV
x $200
Winter UTV
Miles
Winter UTV
x $100
Total Maint.
Gas Tax
Miles
GT Sub-
Total*
Non-GT
Miles
Non-GT
Sub-Total
Total
Troute
Total
Combined
Adams
34.6 $20,760.00
34.6
$6,920.00 $0.00 $0.00 $0.00 $27,680.00 $0.00 $27,680.00
Ashland
$0.00 $0.00 54.2
$5,419.00 $0.00 $0.00 $5,419.00 $0.00 $5,419.00
Barron
91.9 $55,140.00 91.9 $18,380.00 28.0 $2,800.00 $0.00 28.0 $2,800.00 $79,120.00
$0.00 $79,120.00
Bayfield
86.8 $52,080.00 86.8 $17,360.00 171.4 $17,143.00 $0.00 171.4 $17,140.00 $103,723.00 $0.00 $103,723.00
Brown
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Buffalo
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Burnett
59.3 $35,580.00 59.3 $11,860.00 133.1
$13,310.00 $0.00 133.1 $13,310.00 $74,060.00 6.5 $1,618.50
1.0 300 $1,918.50 $75,978.50
Calumet
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cheese Country
(Tri-Co)
57.5 $34,500.00 57.5 $11,500.00 $0.00 $0.00 $0.00 $46,000.00 $0.00 $46,000.00
Chippewa
23.1 $13,860.00 23.1 $4,620.00
$0.00 $0.00 $0.00
$18,480.00 8.2 $2,041.80 $2,041.80 $20,521.80
Clark
63.4 $38,040.00 63.4 $12,680.00 177.8 $17,780.00 $0.00 $0.00 $68,500.00 24.7 $6,150.30 $6,150.30 $74,650.30
Columbia
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00
Crawford
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Dane
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Dodge
$0.00 $0.00 20.0
$2,000.00 $0.00 $0.00 $2,000.00 $0.00 $2,000.00
Door
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Douglas
104.7 $62,820.00 104.7 $20,940.00
338.5 $33,850.00 $0.00 338.5
$33,850.00 $151,460.00 $0.00 $151,460.00
Dunn
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Eau Claire
20.6
$12,336.00 20.6 $4,112.00 20.5 $2,051.00 $0.00 $0.00 $18,499.00 3.3 $816.72 $816.72 $19,315.72
Florence
62.7 $37,620.00 62.7 $12,540.00 68.4 $6,835.00 18.8 $3,768.00 87.2 $8,720.00 $69,483.00 19.5 $4,855.50 12.2 $3,660.00 $8,515.50 $77,998.50
Fond du Lac
$0.00 $0.00 12.0 $1,200.00
$0.00 12.0 $1,200.00 $2,400.00 $0.00 $2,400.00
Forest
62.1 $37,260.00 62.1 $12,420.00 54.1
$5,410.00 8.0 $1,600.00 62.1 $6,210.00 $62,900.00 $0.00 $62,900.00
Grant
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Green
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Green Lake
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Iowa
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Iron
120.0 $72,000.00 120.0 $24,000.00 167.5 $16,750.00 $0.00 167.5 $16,750.00 $129,500.00 $0.00 $129,500.00
Jackson
101.1 $60,660.00 101.1 $20,220.00
104.7 $10,470.00 $0.00 $0.00 $91,350.00
$0.00 $91,350.00
Jefferson
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Juneau
3.0 $1,800.00 3.0 $600.00 3.0 $300.00
$0.00 3.0 $300.00 $3,000.00 $0.00 $3,000.00
Kenosha
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Kewaunee
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
La Crosse
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Lafayette
4.4 $2,640.00 4.4 $880.00 4.4 $440.00 $0.00 $0.00 $3,960.00 $0.00 $3,960.00
Langlade
105.6 $63,360.00 105.6 $21,120.00 482.0 $48,200.00 $0.00 $0.00 $132,680.00 3.8 $1,140.00 $1,140.00 $133,820.00
Lincoln
47.3 $28,380.00 47.3 $9,460.00 227.1 $22,710.00 $0.00 $0.00 $60,550.00 1.0
$249.00
$249.00 $60,799.00
Manitowoc
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Marathon
20.8 $12,450.00 20.8 $4,150.00 693.4 $69,340.00 $0.00 $0.00 $85,940.00 $0.00 $85,940.00
Marinette
206.2 $123,720.00 206.2 $41,240.00 234.2 $23,420.00 $0.00 234.2 $23,420.00 $211,800.00 7.5
$1,867.50
$1,867.50 $213,667.50
Marquette
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Milwaukee
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Monroe
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Oconto
83.3 $49,980.00 83.3 $16,660.00 $0.00 $0.00 $0.00 $66,640.00 9.9 $2,465.10 23.7
$7,107.00
$9,572.10 $76,212.10
Oneida
46.8 $28,080.00 46.8 $9,360.00 $0.00 $0.00
$0.00 $37,440.00 21.1 $5,253.90 $5,253.90 $42,693.90
Outagamie
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Ozaukee
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Pepin
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Pierce
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Polk
31.3 $18,780.00 31.3 $6,260.00 53.2 $5,320.00 $0.00 53.2 $5,320.00
$35,680.00 $0.00 $35,680.00
Portage
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Price
17.1 $10,260.00 17.1 $3,420.00 119.2 $11,920.00 16.2 $3,240.00 135.4 $13,540.00 $42,380.00 0.0
$0.00 $0.00 $42,380.00
Racine
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Richland
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Rock
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Rusk
32.0 $19,200.00 32.0 $6,400.00 $0.00 $0.00 $0.00 $25,600.00 12.9 $3,212.10 $3,212.10 $28,812.10
Sauk
0.8 $480.00 0.8 $160.00 $0.00 $0.00 $0.00 $640.00 $0.00 $640.00
Sawyer
157.1 $94,260.00 157.1 $31,420.00 149.8 $14,980.00 $0.00 $0.00 $140,660.00 $0.00 $140,660.00
Shawano
$0.00 $0.00 559.4 $55,940.00 $0.00 $0.00 $55,940.00 $0.00 $55,940.00
Troute Maintenance
ATV/UTV Summer & Winter Maintenance
Total
County/State
Summer
ATV Miles
Summer ATV
x $600
Summer
UTV Miles
Summer UTV
x $200
SHARED
Winter ATV
Miles
SHARED
ATV Winter
x $100
No Snowmo
ATV Winter
Miles
No Snowmo
Winter ATV
x $200
Winter UTV
Miles
Winter UTV
x $100
Total Maint.
Gas Tax
Miles
GT Sub-
Total*
Non-GT
Miles
Non-GT
Sub-Total
Total
Troute
Total
Combined
Troute Maintenance
ATV/UTV Summer & Winter Maintenance
Sheboygan
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
St. Croix
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00
Taylor
37.4 $22,440.00 37.4 $7,480.00 344.9 $34,490.00 $0.00 $0.00 $64,410.00
5.9 $1,469.10 0.7 $210.00 $1,679.10 $66,089.10
Trempealeau
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
TRI CO COMM
61.2 $36,720.00 61.2 $12,240.00 61.2
$6,120.00 $0.00 61.2 $6,120.00
$61,200.00
$0.00 $61,200.00
USFS Flambeau
74.1 $44,460.00 73.3 $14,660.00 $0.00 $0.00 $0.00 $59,120.00 $0.00 $59,120.00
USFS Great
Divide
63.0 $37,800.00 63.0 $12,600.00 $0.00 $0.00 $0.00 $50,400.00 $0.00 $50,400.00
USFS Washburn
92.0 $55,200.00 92.0 $18,400.00
$0.00 $73,600.00 $0.00 $73,600.00
USFS-Eagle River-
Florence May
Lake
2.2 $1,302.00 2.2 $434.00 $0.00 $0.00 $0.00 $1,736.00 $0.00 $1,736.00
Vernon
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00
Vilas
34.0 $20,400.00 34.0 $6,800.00 1.2
$120.00 $0.00 1.2 $120.00 $27,440.00 12.7 $3,162.30 $3,162.30 $30,602.30
Walworth
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Washburn
116.4 $69,840.00 116.4 $23,280.00 109.0
$10,900.00 46.0 $9,200.00 46.0 $4,600.00 $117,820.00 18.1 $4,506.90 $4,506.90 $122,326.90
Washington
$0.00 $0.00 6.6 $660.00 $0.00 6.6 $660.00 $1,320.00 $0.00 $1,320.00
Waukesha
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
Waupaca
$0.00 $0.00 110.5 $11,050.00 $0.00 110.5 $11,050.00 $22,100.00 $0.00 $22,100.00
Waushara
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Winnebago
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Wood
5.1 $3,060.00 5.1 $1,020.00 $0.00
$0.00 $0.00 $4,080.00 $0.00 $4,080.00
TOTALS: 2,128.8 $1,277,268.00 2,128.0 $425,596.00 4,509.3 $450,928.00 89.0 $17,808.00 1,651.1 $165,110.00 $2,336,710.00 151.3 $37,668.72 41.4 $12,417.00 $50,085.72 $2,386,795.72
Summer Maint Insurance & Acq Requests $10,473
* Gas Tax Rate for 22-23
Florence Co.
$1,231.00 $249.00 per mile
Barron Co.
$3,520.00 Winter Maint Insurance & Acq Requests $2,154
Fond du Lac
$0.00
Kewaunee Co.
$11,500.00
Dyracuse
$74,833.24
Tigerton
$57,535.00
Wood Co.
$6,926.00
Total
$155,545.24
Intense Use Area Maintenance
50%
Estimated Available Funds 2022-23
Starting Funds Available Registration 577 $8,697,205.31
Gas Tax 576 $2,890,440.08
Total $11,587,645.39
Estimated Preliminary Expenditures
>Existing Maintenance
Summer ATV $1,287,741.00
Summer UTV $425,596.00
Winter ATV (shared with snowmobiles) $453,082.00
Winter ATV (not shared with snowmobiles) $17,808.00
Winter UTV $165,110.00
Troute $50,085.72
Area $155,545.24
Maintenance Total $2,554,967.96
>Balance Available for Remainder of Priorities $4,193,655.38 per Chapter 20
Requested Funded
Storm Damage Requests $11,920.00 $11,920.00
Cost Increase Requests $390,196.67 $262,243.00
New Applications Received - listed in priority order under s. NR 64.14(1)
ATV Trail/Bridge Rehabilitation $1,718,482.07 $1,678,485.00
New year around trails $54,434.00 $54,434.00
New summer trails $965,719.74 $201,025.00
New winter trails $90,230.00 $90,230.00
New Troute Requests $1,269.90 $0.00
New intensive use areas $189,000.00 $189,000.00
New support facilities $98,442.00 $98,442.00
Maps $4,500.00 $4,500.00
Acquisition $10,000.00 $10,000.00
Communication Equipment $70,244.60 $0.00
Safety Signage $0.00 $0.00
Statewide App $0.00 $0.00
Total of Requests Received $3,604,438.98 $2,600,279.00
Balance
TBD
2022- 23 Proposed County ATV/UTV Program
Region County Component Costs Total Approved Comments
Bridges
$11,920
Culverts
After Cost Share:
Equip & Labor
$1,120
$11,920
Other
Large rock $9,000
Gravel $1,350
Geofabric $450
Other funds received, requested, or committed?
Yes or No:
No
Amount: 0
FEMA Eligible?
No
FEMA Applied For?
N/A
$11,920
TOTAL $11,920 $11,920
2022-23 ATV STORM DAMAGE REQUESTS
NOR-R
Oneida
Oneida County is requesting funding to repair an ATV trail due to
storm damage. Rainstorms over the Memorial Day Weekend created
a major washout along about 250 feet of funded trail in the Town of
Little Rice. The trail is currently closed until repairs can be made.
Work would consist of excavating washout material, and installing
geofabric, large material, and a gravel cap. While this trail is also a
funded snowmobile trail, the storm was not declared an emergency by
the Governor, and so does not qualify for storm funding under that
program.
Motion to
recommend
funding by Jim,
2nd by Mike.
PASSED
$ 11,920
#82
Page 4 of 31
Region County
New/Increase
Component
New Costs Total Approved Comments
COSTS
$67,000
Bid Overrun $8,335
After Cost Share:
Engineering $13,665
$44,344
Oversight $20,000
Adnl RipRap $25,000
Other funds received, requested, or committed?
Yes or No: YES Amount:
22,656$
Original Grant # ATV-4122S Funding Cat. Storm
Previous Grant
Amt
$99,172
New Grant Amt
(After)
$143,516
$44,344
COSTS
$24,155
Materials/Labor $24,155
After Cost Share:
$24,155
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4426 Funding Category Trail Rehab
Prev Grant Amt $22,705
New Grant Amt
(After)
$46,860
$24,155
COSTS
$8,440
2nd Printing $8,440
After Cost Share:
$8,440
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4465 Funding Cat. Maps
Previous Grant
Amt
$8,080
New Grant Amt
(After)
$16,520
$8,440
SCR
Tri-Co (Cheese
Country)
Tri-County (Cheese Country) received a grant in fall of 2020 to repair
900 ft of shoreline along the Pecatonica River that had washed out in
a storm event. The origianl cost estimate was $198,334 split between
snowmobile and ATV. Since that time, bids have come in higher than
expected. Additional riprap is needed as well. The revised cost
estimate is $265,350. An additional $67,000 is requested, split
between snowmobile and winter ATV
$33,500
Note, Snow did not
cover oversight.
50% of total would
be $33,500.
2022-23 ATV COST INCREASE REQUESTS
NOR-R
Langlade
Langlade County is requesting additional funding for grant ATV-4426
(Brown Bridge Trail Rehab in 2021). Due to large increases in
material and labor costs the total project cost is now estimated at
$46,860.00. This estimate is based on results of a request for
proposals for completion of this project.
$24,155
State
NOHVIS
NOHVIS is requesting a cost increase and scope change to grant ATV-
4465 to print a second year's worth of statewide trail maps in the
spring of 2023. Original application was for one year of printing only.
$8,440
Motion to
recommend funding
by Jim, 2nd by
Dave. PASSED
#84
#83
#85
Page 5 of 31
Region County
New/Increase
Component
New Costs Total Approved Comments
2022-23 ATV COST INCREASE REQUESTS
COSTS
$35,321
Materials/Labor $35,321
After Cost Share:
$35,321
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4427 Funding Category Trail Rehab
Prev Grant Amt $43,420
New Grant Amt
(After)
$78,741
$35,321
ADDITIONAL COSTS
$88,091
Clearing/Grub $10,027
After Cost Share:
Build Tr Base $39,350
$88,091
Culverts $3,114
Bridge Overrun $35,600
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4320 Funding Category Summ Dev
Prev Grant Amt $568,900
New Grant Amt
(After)
$656,991
$88,091
ADDITIONAL COSTS
$90,920
Electrical/lightin
$4,720
After Cost Share:
Septic System $8,600
$90,920
Well and Piping
$5,400
Site Work $4,800
Shower/Rest Fa
$67,400
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4458 Funding Category Summ Dev
Prev Grant Amt $327,689
New Grant Amt
(After)
$418,609
$90,920
NOR-S
Rusk
Rusk County is requesting additional funds to complete a 2020 project
to develop 6 miles of new trail and construct a bridge over Big Weirgor
Crk. The Hwy Dept is providing the trail surface development and has
instructed the Co Forestry Dept that the original estimates are
insufficient due to increased material and fuel cost.
$88,091
Motion to
recommend funding
by Ed, 2nd by Dan.
PASSED
NOR-R
Langlade
Langlade County is requesting additional funding for grant ATV-4427
(Fraley-Wallrich Trail Rehab in 2021). Due to large increases in
material and labor costs the total project cost is now estimated at
$78,741.00. This estimate is based on results of a request for
proposals for completion of this project.
$35,321
Motion to
recommend funding
by Jim, 2nd by Ed.
PASSED
NOR-R
Florence
Florence County is requesting additional funding for grant ATV-4458
(West Bass Lake Campground Restroom/Shower Replacement in
2021). Due to large increases in material and labor costs the total
project cost is now estimated at $499,500.00. This estimate is based
on direct manufacturer pricing for materials on this project. Original
project total = $409,405 with an ATV grant award of $327,689 and
RTP grant award of $45,825 ($373,514 total grant funds).
$72,736
Motion to
recommend funding
increase at 80% as
was done with the
original grant by
Mike, 2nd by Dave.
PASSED
#86
#88
#87
Page 6 of 31
Region County
New/Increase
Component
New Costs Total Approved Comments
2022-23 ATV COST INCREASE REQUESTS
ADDITIONAL COSTS
$98,926
As Bid (80%) $98,926
After Cost Share:
$98,926
Other funds received, requested, or committed?
Yes or No: No Amount:
Original Grant # ATV-4460 Funding Category Summ Dev
Prev Grant Amt $227,464
New Grant Amt
(After)
$326,390
$98,926
TOTAL $390,197 $262,243
NOR-S
Minong, Village
of
The Village of Minong is seeking additional funds to complete the
expansion of the Minong Wild River ATV/UTV Park and Campground.
Eleven additional campsights with full water/sewer and electroical are
being added, as well as a picnic area nd ATV wash station. The
original project estimate was $346,830 total, and ORV recommended
funding 80%. The revised project (as bid) is $470,486.59 total - a total
increase of $123,656.59. An 80% cost share of this would be
$98,925.27
Added Sept 2022,
for next meeting
#89
Page 7 of 31
Region County Component Costs Total Approved
Question/Answer
NOR-R
*Structure
$91,300
Engineer
After Cost Share:
Gravel $75,000
Permits/Erosion
Asphalt $1,800
Culverts
Other funds received, requested, or committed?
Breaker Run $14,500
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared) M
$0
Exception?
Water Body: N/A Labor Source:
Contract
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
N/A
Winter UTV Main
$0
$91,300
NOR-R
*Structure $73,000
$251,500
Engineer $30,000
After Cost Share:
Gravel
Permits/Erosion $22,500
Approaches $31,000
Abutments $28,500
Other funds received, requested, or committed?
Riprap $1,500
Yes or No:
Yes
Amount: 175,750.00$
Labor $45,000
Public or Private:
Public
Funded seasons:
Year Round
Site Prep $20,000
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12 x 80 New Bridge Size
12 x 80
Winter (Shared) M
$0
Exception?
Water Body: Swanson Creek Labor Source:
Contract
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
30,000
Winter UTV Main
$0
$75,750
NOR-R
*Structure
$72,095
Engineer
After Cost Share:
Gravel $30,000
Breaker Run $26,100
Asphalt $900
Pit Run $13,250
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 60,076.00$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental $1,845
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared) M
$0
Exception?
Water Body: N/A Labor Source:
Contract
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
N/A
Winter UTV Main
$0
$12,019
2022-2023 ATV REHABILITATION REQUESTS
Description
Vilas
Vilas County proposes to rehab about 1.6 miles of ATV/UTV trail on Snow Trail 3 in the
Town of Conover, from CTH K south to Torch Lake Rd. The existing trail is an old
railroad grade. Work will include adding larger material to raise low sections and
problem areas and installing 6 inches of gravel over the full distance. Two asphalt
approaches will be installed where the trail connects to the CTH K and Torch Lake Rd.
County applied for but did not receive RTP funds.
$91,300
Vilas
Needs current pictures --
Added to application
Motion to recommend funding
by Jim, 2nd by Dave. PASSED
$91,300
Why does Appendix A show
30,000 but the estimates are for
25,000? What capacity does
the Co propose? -- Per County,
they only propose 25,000lbs.
More pictures added to
application. Motion to
recommend funding by Dave,
2nd by Jim. PASSED
Vilas County proposes to rehab about 2 miles of ATV/UTV trail on Snow Trail Corridor
13 in the Town of Conover, from Deep Lake Rd north to E Buckatabon Rd
. Work will
include adding breaker run and road gravel in the corners to help with sandy soil, and
an asphalt approach where the trail comes out on the town road.
The county has been
tentatively approved to receive $60,076 in RTP funds.
$12,019
Needs current pictures --
Added to application
Motion to recommend funding
by Dave, 2nd by Ed. PASSED
$12,019
Forest
Forest County proposes to replace the existing Swanson Creek Bridge (DNR#21-005)
on the Nicolet State Trail with a new 12’x80’ bridge. The current bridge is over 60
years old and in poor condition. The county is also Snow grant funds, and was
tentatively approved for $100,000 in RTP funds .
$75,750
$75,750
#1
#2
#3
Page 8 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-R
*Structure
$23,597
$44,255
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap $1,500
Yes or No:
Yes
Amount: 22,128.00$
Labor $11,210
Public or Private:
Public
Funded seasons:
Year Round
Equip Rental $6,248
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Disposal $1,700
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12 x 20 + 12's New Bridge Size
12 x 40
Winter (Shared) M
$0
Exception?
Water Body: Boomer Creek Labor Source:
Force Acct
Winter (Solo) Mai
$0
Years in System: 18 yrs Design Weight Load:
25,000
Winter UTV Main
$0
$22,127
NOR-R
*Structure
$22,325
Engineer
After Cost Share:
Gravel
Permits/Erosion $3,500
Asphalt $7,875
Culverts
Other funds received, requested, or committed?
Riprap $4,950
Yes or No: Amount:
Labor $1,000
Public or Private: Funded seasons:
Equip Rental $5,000
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$22,325
NOR-R
*Structure
$390,529
Engineer
After Cost Share:
Gravel $198,000
Permits/Erosion $7,000
Materials $80,764
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor $83,765
Public or Private:
Public
Funded seasons:
Equip Rental $21,000
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12x324 New Bridge Size
N/A
Winter (Shared) M
$0
Exception?
Water Body: Nine Mile Creek Labor Source:
Winter (Solo) Mai
$0
Years in System: 12 Design Weight Load:
10,000
Winter UTV Main
$0
$390,529
Iron
Iron County proposes to replace the existing Boomer Creek Bridge (Bridge#32) on a
year-round ATV/UTV and Snowmobile Trail 2. The original bridge was 20 ft x 12 ft
timber frame with 12 ft approaches and constructed in 2004. The timber is
deteriorating on the approaches, decking, and railing; and needs replacement. The
new bridge will be a 40ft steel span and make use of the existing concrete abutments.
The County proposes to split the costs with Snow grant funds.
$22,127
County should reach out to
WMS and see if H&H Study will
be needed. -- Per County, they
have discussed with zoning
about floodplain. H&H will not
be needed. Motion to
recommend funding by Dave,
2nd by Mike. PASSED
$22,127
Motion to recommend funding
by Mike, 2nd by Dave.
PASSED
$22,325
Price
Price County proposes to rehab the 12-mile Georgetown ATV/UTV trail system, a few
miles west of Phillips. Work will include reshaping the trail surface, adding 4” gravel,
and grading. This project also includes redecking 8 boardwalks (12x447 feet in total)
and Nine-Mile Bridge (12x324 feet). The existing decking is more than 10 years old
and is undersized and deteriorating. The County applied for but did not receive RTP
funds.
$390,529
Need current condition photos
of all 8 boardwalks plus the
bridge, showing the need.
Need more photos of the trail
surface that shows the need of
gravel. -- Boardwalk photos
added Motion to
recommend funding by Ed, 2nd
by Jim. PASSED
$390,529
Oneida
Oneida County proposes a rehab project on 1.5 miles of ATV/UTV trails in the
Enterprise
trail network. The County will address erosion on seven hills within the trail
segment. Work will include re-sloping trails and side-slopes and adding 4” of recycled
asphalt to the trail surface. Rip-rap ditches and armoring will be added as needed to
help control water and erosion. Total trail surface to be addressed is about 2,100 feet.
$22,325
#4
#5
#6
Page 9 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-R
*Structure
$20,137
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials $200
Culverts $300
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 10,068.00$
Labor $10,656
Public or Private:
Public
Funded seasons:
Year Round
Equip Rental $8,981
New Sum ATV
Mit
0.1
New Shared Wint. ATV
Mit
0.1
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$60
New Sum UTV
Mit
0.1 New Winter UTV Maint 0
Sumer UTV Main
$20
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared) M
$10
Exception?
Water Body: N/A Labor Source:
Force Acct
Winter (Solo) Mai
$0
Years in System: 12+ Design Weight Load:
N/A
Winter UTV Main
$0
$10,159
NOR-R
*Structure
$11,669
Engineer
After Cost Share:
Gravel $1,250
Permits/Erosion
Crushed Ore $875
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Year Round
Equip Rental $9,544
New Sum ATV
Mit
0
New Shared Wint. ATV
Mit
0
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV Main
$0
New Sum UTV
Mit
0 New Winter UTV Maint 0
Sumer UTV Main
$0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared) M
$0
Exception?
Water Body: N/A Labor Source:
Contract
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
N/A
Winter UTV Main
$0
$11,669
NOR-S
*Structure
$25,650
Engineer
After Cost Share:
Gravel $7,888
Permits/Erosion
Materials $74
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 20,520.00$
Labor $7,591
Public or Private:
public
Funded seasons:
Equip Rental $10,097
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$5,130
Lincoln
Lincoln County proposes to relocate a 0.25-mile portion of trail on the North Loop
system due to steep topography and erosion. The new segment will be 0.33 mile in
length (increase of 0.1 mile for maintenance) and will use an existing logging road for a
portion. Work will include tree removal, grading, stumping, gravelling, installing a
culvert, and decommissioning the old trail segment. The County proposes to split a
portion of this work with Snow grant funds.
$10,159
ORV proposes that
Snowmobile cover 50%. (Y) Is
additional funding needed for
gravel, or is that covered with
equipment/labor? Is that why
the funding is split the way it
was proposed by the County?
Split was proposed at 75/25
based on the # of months of
use, and extra wear caused by
ATVs vs Snowmo. Should be
sufficient on site material to
screen as opposed to hauling in
gravel. "Fund" by Jim, Mike.
PASSED
$10,069
Florence
Florence County proposes to rehab two sections of ATV/UTV/Snow trail F2, totaling
about 0.5 mile. The County will be addressing trail visibility in this segment in
response to near accidents. Work will include realigning trail to remove sharp corners,
building new trail base, and graveling. The County requested funding from both Snow
and ATV, but due to Snow Fund rules, is not eligible due to receiving rehab funds on
this segment in the last 10 years and minimum trail length of 3 miles.
$11,669
Motion to recommend funding
by Mike, 2nd by Dave.
PASSED
$11,669
Burnett
Trail 5 (1.9 miles long) is located in northern Burnett County. Repairs include leveling
heavily banked corners; re-establishing a crown to promote water runoff from the trail
surface and adding gravel to improve safety, proide a maintainable trail surface and
prevent erosion. Total Est. $25,650.00 County is tentatively approved to receive
RTP $20,520
$5,130
Motion to recommend funding
by Dan, 2nd by Mike. PASSED
$5,130
#7
#8
#9
Page 10 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$30,000
Engineer $18,000
After Cost Share:
Gravel
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 27,000.00$
Labor $12,000
Public or Private:
public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: 42' x 12' New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: unnamed
t
Labor Source:
Winter (Solo) Mai
$0
Years in System: 22 Design Weight Load:
25,000
Winter UTV Main
$0
$3,000
NOR-S
*Structure
$38,386
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials $38,386
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor
Public or Private:
public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$38,386
NOR-S
*Structure
$36,224
Engineer
After Cost Share:
Gravel $13,163
$7,245
Materials $90
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 28,979.00$
Labor $8,950
Public or Private:
public
Funded seasons:
Equip Rental $14,021
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
$7,245
Why does only one estimate
include abutments?
Motion to recommend funding
by Dan, 2nd by Mike. PASSED
$3,000
Burnett
ATV Trail Approach Improvements - proposing to pave ATV trail approaches in the
Town of Swiss. Nine different locations. 15' x 15' paved approaches The county
applied for but did not receive RTP funds.
$38,386
Are these ATV/UTV only trails,
or are there other uses? Does
the town have the authority to
close the trail/disallow the
crossing?
Motion to recommend funding
by Dave, 2nd by Ed. PASSED
$38,386
Burnett
Trail 41 is located in northern Burnett County. Repair problem areas on a 2.4 mile
stretch between Namekagon Trail and Five Mile Rd. Repairs include filling in holes
and restablishing a crown to promote water runoff from the trail surface, leveling
banked corners, adding gravel where necessary and repairing a large are of off-trail
damage directly adjacent to the trail. Total Est. $36,224.00 ATV $7,245.00 RTP
$28,979.00 The county has been tentatively approved for $28,979 in RTP funds.
Burnett
Trail 130 Bridge Rehabilitation - Bridge rehabilitation on a snowmobile/winter ATV
trail in northern Burnett County. This 42' x 12' bridge was installed in 2000 and is rated
for 12,000 lbs. Proposing replacing the bridge deck and bringing the bridge up to a
25,000 lb load rating and installing new guardrails along the approaches for safety.
Total Est. $30,000 ATV $3,000 SNO $3,000 RTP $24,000. County has been
tentatively approved for $24,000 in RTP funds.
$3,000
FYI after discusson. Turf &
Tundra club provides basic
maintenance.
Motion to recommend funding
by Jim, 2nd by Dan. PASSED
7245
#12
#10
#11
Page 11 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$49,859
Engineer
After Cost Share:
Gravel
Materials $30,000
Approaches
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 24,929.50$
Labor $19,859
Public or Private:
public
Funded seasons:
Other
New Sum ATV
Mit
New Shared Wint. ATV
Mit
H&H Study
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: St Croix River Labor Source:
Winter (Solo) Mai
$0
Years in System: 110 Design Weight Load:
Winter UTV Main
$0
$24,930
NOR-S
*Structure
$7,471
Engineer
After Cost Share:
Gravel
Materials $5,191
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 3,735.50$
Labor $1,180
Public or Private:
public
Funded seasons:
Equip Rental $1,100
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$3,736
NOR-S
*Structure $110,000
$503,000
Engineer $60,000
After Cost Share:
Site Prep $26,000
Pilings/Piers $201,000
Approaches $15,000
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
yes
Amount: 251,500.00$
Labor
Public or Private:
public
Funded seasons:
Winter ATV/UTV
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Other $91,000
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12' x 67' New Bridge Size
12' x 100'
Winter (Shared) M
$0
Exception?
Water Body: Pokegama River Labor Source:
Contract
Winter (Solo) Mai
$0
Years in System: 13 Design Weight Load:
25,000
Winter UTV Main
$0
$251,500
Douglas
Trail 35 Culvert Repair. Proposing repairing one of three culverts at this location.
Replace the missing rod with a cable to prevent future culvert failure. Repair the riprap
on the inlet side of the culverts to help protect the soil around the culverts.
Snowmobile/Year Around ATV Total
Est $7,471.00 ATV $3,735.50 Snow $3,735.50
$3,736
Douglas
Trail 35 St. Croix Bridge Redeck Proposing to replace the deck boards of the old St.
Croix River rail road bridge on the Wild Rivers Trail in the Town of Gordon. Remove
the old decking and replacing it with 2' x 10" sawn white oak. The size of the deck is
10' x 150'. Total Est. $49,859.00
$24,930
Motion to recommend funding
by Dave, 2nd by Mike.
PASSED
$24,930
Douglas
Trail 2 Pokegama Bridge Replacement - Proposing to replace the bridge on Trail 2
(BI DOUG2) Slope stability failure at both banks. An engineering solution would be to
provide a stronger abutment wall utilizing steel sheet piling to retain the approach fills,
or a longer bridge to span the bank areas or a best cost combination of both.
Total Est. $503,000 Snow $251,500 ATV $251,500
Motion to recommend funding
by Jim, 2nd by Dan. PASSED
$3,736
$251,500
Motion to recommend funding
by Dan, 2nd by Mike. PASSED
$251,500
#16
#14
#15
Page 12 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$88,000
$170,000
Engineer $27,500
After Cost Share:
Site Prep $2,000
Permits $3,000
Abutments $20,000
Approaches $2,000
Other funds received, requested, or committed?
Riprap $2,000
Yes or No:
Yes
Amount: 85,000.00$
Labor $10,000
Public or Private:
public
Funded seasons:
Other $3,000
New Sum ATV
Mit
New Shared Wint. ATV
Mit
H&H Study $12,500
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12' x30' New Bridge Size
12' x 80'
Winter (Shared) M
$0
Exception?
Water Body: Erickson Creek Labor Source:
Winter (Solo) Mai
$0
Years in System: 10 Design Weight Load:
25,000
Winter UTV Main
$0
$85,000
NOR-S
*Structure $200,000
$291,000
Engineer $15,000
After Cost Share:
Site Prep $3,000
Abut,ments $35,000
Approaches $3,000
Other funds received, requested, or committed?
Labor $10,000
Yes or No:
yes
Amount: 145,500.00$
Other $25,000
Public or Private: Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
12' x 130'
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
25,000
Winter UTV Main
$0
$145,500
NOR-S
*Structure
$9,044
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials $9,044
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 4,522.00$
Labor
Public or Private:
public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$4,522
Tri-County
Fish Creek Bridge #2 Snow & YR ATV Project is to remove the old bridge and
pilings and install a new 12' x 130' freespan bridge.
TPC $291,000 Snow $145,500 ATV $145.500
$145,500
Motion to recommend funding
by Ed, 2nd by Dan. PASSED
$145,500
Douglas
Trail 4/41 Reroute and Bridge Rehab. Proposing to relocate the winter crossing of
Erickson Creek out of a large swamp area 3000 feet to the south to a location of an old
road bed that used to cross the creek. The abandoned road and the forestry roqd on
the east side of the crrek already connect to the existing trail. Total Est.
$170,000 ATV $85,000 Snow $85,000
$85,000
Need photos of new site.
Application materials updated.
Motion to recommend funding
by Jim, 2nd by Dan. PASSED
$85,000
Polk
Sawmill Trail Rehabilitation - Clear Lake. This 13.67 mile long rail trail is rutted, not
marked well and in most of this segment, the trail is not well defined. This project will
bring in 250 tons of CL-5 fill to restore the 700-foot segment of trail and new signage.
TPC $10,852 Snow $5,426 ATV $5,426
$4,522
Signs are typically covered by
maintenance grants. Why
aren't suffiicent signs being
paid for by mainteance, what is
maintenance funding going
towards? Also, please re-do
cost estimate w/o contingency
line item.
Motion to recommend funding
(w/o contingency) by Jim, 2nd
by Ed. PASSED
$4,522
#17
#19
#18
Page 13 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$95,500
Engineer
After Cost Share:
Gravel $25,300
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 76,400.00$
Labor $70,200
Public or Private:
public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$19,100
NOR-S
*Structure
$92,295
Engineer
After Cost Share:
Gravel $52,520
Permits/Erosion
Materials $22,725
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 73,836.00$
Labor $17,050
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$18,459
NOR-S
*Structure
$53,950
Engineer
After Cost Share:
Gravel $39,650
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 43,160.00$
Labor $14,300
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$10,790
Trail 11 - Tuscobia to Lost Lake Road South The project will rehab 3.1 miles of Trail
11 from the Tuscobia Trail to Lost Lake Road South by crowning and placing four
inches of gravel. County has been tentatively approved to receive $73,836 in RTP
funding.
$18,459
Sawyer
Tuscobia Rehabilitation - Hwy 40 - Hwy 27 This project will rehab 4.6 miles of trail by
shaping and crowning to improve drainage and then adding 3 inches of gravel.
County has been tentatively approved to receive $76,400 in RTP funding.
$19,100
Motion to recommend funding
by Dave, 2nd by Mike.
PASSED
$19,100
Sawyer
Motion to recommend funding
#21, 22 and 23 by Jim, 2nd by
Ed. PASSED
$18,459
Sawyer
Tuscobia Rehabilitation - Wooddale to Wooddale This project will rehab 2.6 miles of
trail by shaping and crowning to improve drainage and adding three inches of gravel.
County has been tentatively approved to receive $43160 in RTP funding.
$10,790
see above
$10,790
#20
#21
#22
Page 14 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$104,130
Engineer
After Cost Share:
Gravel $82,680
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 83,304$
Labor $21,450
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$20,826
NOR-S
*Structure
$45,750
Engineer
After Cost Share:
Gravel $36,400
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor $9,350
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$45,750
NOS
*Structure
$53,900
Engineer
After Cost Share:
Gravel $42,900
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor $11,000
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$53,900
Sawyer
Trail 31 Rehabilitation - Rusk County to Tuscobia Trail. This project will rehab 3.9
miles of trail by shaping and crowning and adding 5 inches of gravel. County has
been tentatively approved to receive $ 77,751.61
$83,304 in RTP funding.
$53,900
see above
$53,900
No questions. Council made a
motion to fund $26,379 based
on the info at the meeting that
RTP cost share was only
$77,751.61. Following the
meeting, RTP was increased to
$83,304 so ATV share is
reduced accordingly. Motion
to recommend funding by Jim,
2nd by Ed. PASSED
$20,826
Sawyer
Trail 15 Rehabilitation - Phipps Fire Lane to Hwy 77 This project will rehab 1.7 miles of
trail by shaping and crowning and adding 5 inches of gravel. County applied for but
did not receive RTP funding.
$45,750
Motion to recommend funding
#24 and #25 by Mike, 2nd by
Dan. PASSED
$45,750
$20,826
Sawyer
Trail 77 Rehabilitation - Janet Road to Telemark Rd This project will rehab 2.0 miles of
trail by shaping and crowning and adding 5 inches of gravel. County applied for but
did not receive RTP funding.
#23
#24
#25
Page 15 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$16,000
$255,000
Engineer $160,000
After Cost Share:
Site Prep $4,000
Abutments $40,000
Approaches $8,000
Culverts
Other funds received, requested, or committed?
Riprap $4,000
Yes or No:
yes
Amount: 127,500.00$
Labor $20,000
Public or Private:
public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
H&H Study $3,000
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
12' x 160'
Winter (Shared) M
$0
Exception?
Water Body: Potato Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$127,500
WCR
*Structure
$5,220
Engineer
After Cost Share:
Gravel $3,500
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 2,610$
Labor $940
Public or Private:
Private
Funded seasons:
Equip Rental $780
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$2,610
WCR
*Structure
$13,817
Engineer
After Cost Share:
Gravel $11,200
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 6,908.50$
Labor $1,080
Public or Private:
Private
Funded seasons:
Equip Rental $1,537
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$6,909
Jackson
Jackson Co Forestry & Parks has been required to relocate a section of
ATV/UTV/Snowmobile trail due to a land sale for a parking lot expansion of a local
Culvers restaurant. Trail is part of the City of Black River Falls connector. Total cost
is $6,000, split 50/50 with Snow
$2,610
Motion to recommend funding
#28 and #29 by Dan, 2nd by
Mike. PASSED
$2,610
Washburn
Potato Creek Mandatory Trail Relocation with NEW Snow/ATV Bridge. Proposing
constructing a new bridge over Potato Creek due to the construction of the new USH
63 and USH 53 interchange at Trego.
$127,500
Jackson
Jackson Co Forestry & Parks has been required to relocate a section of
ATV/UTV/Snowmobile trail connecting to Black River Falls due to a land sale with
new owner requiring trail to vacate property. New trail location comes with 10 year
LUA. Total cost is $13,817, split 50/50 with Snow
$6,909
(could combine 28 and 29 as
one grant)
$6,909
Motion to recommend funding
by Dan, 2nd by Dave.
PASSED Ed Abstains
$127,500
#28
#29
#26
Page 16 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
WCR
*Structure
$100,000
$100,000
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor
Public or Private:
Public
Funded seasons:
Equip Rental
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$100,000
WCR
*Structure
$43,874
Engineer
After Cost Share:
Gravel $37,800
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No: Amount:
Labor $1,890
Public or Private:
Public
Funded seasons:
Equip Rental $4,184
New Sum ATV
Mit
New Shared Wint. ATV
Mit
Gates
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: New Bridge Size
Winter (Shared) M
$0
Exception?
Water Body: Labor Source:
Winter (Solo) Mai
$0
Years in System: Design Weight Load:
Winter UTV Main
$0
$43,874
WCR
*Structure
$16,374
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials $15,974
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount:
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental $400
New Sum ATV
Mit
0.8 New Sum UTV Maint 0.8
Gates
Variance or
Old Bridge Size: New Bridge Size
Exception?
Water Body: Labor Source:
ATV Maint $480
Design Weight Load:
UTV Maint $160
$17,014
$100,000
Jackson
The Jackson County Forestry and Parks Department is proposing to rehabilitate
approximately 2 miles of ATV/UTV trail that is subject to periodic closures due to storm
events. The rehabilitation will consist of crowning the entire two mile section and
adding base course to approximately 1 mile of the trail. This rehabilitation will eliminate
the closures permanently. The total estimated cost is $43,874.00. County applied for
but did not receive RTP funds.
$43,874
Motion to recommend funding
by Jim, 2nd by Mike. PASSED
$43,874
Juneau
Juneau County proposes to relocate riders off of a busy road route crossing Hwy 58 by
developing 0.8 miles of funded ATV/UTV trail that connects to existing funded trail.
The proposed new trail will add 0.8 miles to the funded trail system.
$17,014
Motion to recommend funding
by Dan, 2nd by Ed. PASSED.
$16,374
Jackson
The Jackson Co Parks Department has received a number of complaints from
Township Officials and WISDOT staff that sand, mud and gravel are being deposited
on public ATV /UTV trail crossings in Jackson County. Jackson Co. and the Black
River Area Chamber of Commerce paid for paved aprons on a crossing in 2021 and
the apron eliminated deposition of material on the roadway. Jackson Co. requests
$100,000 to pave 10 additional crossings (20 total aprons) in the first phase of the
project. All crossings will be done in the Town of Brockway in phase one. County
applied for but did not receive RTP funding
$60,000
Why 50' x 20'? Could some be
14'w x 20'l, which is DOT's
guidance? Council may not be
comfortable covering 100%, get
estimates for 14'w x 20'l to
base grant on, and make case
for those crossings that might
be absolutely necessary due to
state highway requirements or
grade changes. Comments
and photos added to
application Motion to
recommend funding at #3,000
for each of 20 aprons, for a total
$60,000 by Jim, 2nd by Dave.
MOTION PASSED.
#30
#31
#46
Page 17 of 31
Region County Component Costs
Total Approved
Question/Answer
2022-2023 ATV REHABILITATION REQUESTS
Description
NOR-S
*Structure
$50,851
$93,851
Engineer $27,500
After Cost Share:
Site Prep
Permits $3,000
Abutments
Approaches
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 46,925.50$
Labor
Public or Private:
public
Funded seasons:
Other
New Sum ATV
Mit
New Shared Wint. ATV
Mit
H&H Study $12,500
New Solo Wint. ATV
Mit
Sumer ATV Main
$0
New Sum UTV
Mit
New Winter UTV Maint
Sumer UTV Main
$0
Variance or
Old Bridge Size: 12' x 30' New Bridge Size
12' x 40'
Winter (Shared) M
$0
Exception?
Water Body: Moose River Labor Source:
Winter (Solo) Mai
$0
Years in System: 80 Design Weight Load:
25,000
Winter UTV Main
$0
$46,926
$1,718,482 $1,678,485
Douglas
Trail 41 Paske Bridge. Proposing replacing an old bridge over the Moose River. The
original bridge utilizes piers from an old dam and the current bridge has been in place
since the 1960's. **This project could potentially use a bridge from the Pokegama
River if that project is approved. Total Est.
$93,851.00 ATV $46,925.50 Snow $46,925.50
$46,926
Motion to recommend funding
by Dan, 2nd by Mike.
PASSED.
$46,926
#52
Page 18 of 31
Region County Component Costs Total Approved
Question/Answer
NOR-R
*Structure
$73,692
Engineer
After Cost
Sh
Gravel $12,000
Permits/Erosio
$700
Breaker Run $2,250
Pit Run $2,000
Piling/Piers
Approaches
Culverts $4,750
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 22,108.20$
Labor $22,420
Public or Private:
Public
Funded seasons:
Year Round
Equip Rental $29,572
New Sum ATV
Mit
2.85
New Shared Wint.
ATV M i t
2.85
Gates
New Solo Wint. ATV
Mit
0
Sumer ATV M
$1,710
New Sum UTV
Mit
2.85 New Winter UTV Maint 2.85
Sumer UTV M
$570
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared
$285
Exception?
Water Body: N/A Labor Source: Force Acct
Winter (Solo) M
$0
Years in System: Design Weight Load: N/A
Winter UTV M
$285
$54,434
$54,434.00 $54,434.00
Motion to
recommend
funding by Dan,
2nd Mike.
MOTION
PASSED.
$51,584
2022-2023 ATV NEW YEAR ROUND TRAIL REQUESTS
Description
Iron
Iron County proposes to develop a new 2.85-mile year-round ATV/UTV. This trail
would overlap with a reroute of Snow Trail 8 from W Branch Rd to Island Lake Rd.
in the Town of Carey. The new trail would utilize existing logging roads. Work
would include clearing and grubbing, grading, installing culverts and large material
as needed, and installing gravel. Some costs for this project are proposed to be
split with Snow to relocate Trail 8 to avoid beaver ponds. There are no bridges on
this proposed trail section.
$54,434
#32
Page 19 of 31
Region County Component Costs Total Approved
Question/Answer
NOR-R
*Structure
$56,600
Engineer
After Cost Share:
Gravel $55,600
Permits/Erosion
Materials
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
1.6 New Sum UTV Maint 1.6
Gates $1,000
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
Contract
ATV Maint $960
Design Weight Load:
N/A
UTV Maint $320
$57,880
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
1 New Sum UTV Maint 1
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
N/A
ATV Maint $600
Design Weight Load:
N/A
UTV Maint $200
$800
2022-2023 ATV NEW SUMMER TRAIL REQUESTS
Description
Vilas
Sayner Connect: Vilas County proposes to develop a new 1.6-mile ATV/UTV
summer trail from Froelich Drive to Plum Creek Drive in Sayner. The trail will follow
Snow Trail 15 and provide through connection to local businesses on the south side
of town. Work would include installing a gravel base and gates for the trail. There
are no bridges on this proposed trail.
$57,880
Motion to
recommend funding
by Jim, 2nd Dan.
Motion Passed.
$56,600
Vilas
St Germain – Birchwood to Holiday: Vilas County proposes to maintain a new 1-
mile ATV/UTV summer trail on Snow Trail Corridor 15, from Birchwood Dr to E
Holiday Dr in St Germain. This trail will connect the current network to businesses
on the south end of town. The trail is fully developed and open to ATVs at this time.
There are no bridges on this proposed trail. This request is for new maintenance
funds only.
$800
Motion to
recommend funding
by Dan, 2nd Mike.
Motion Passed.
$0
#35
#36
Page 20 of 31
Region County
Component
Costs Total Approved
Question/Answer
2022-2023 ATV NEW SUMMER TRAIL REQUESTS
Description
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
0.8 New Sum UTV Maint 0.8
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
N/A
ATV Maint $480
Yes
Design Weight Load:
N/A
UTV Maint $160
$640
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Both
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
0.25 New Sum UTV Maint 0.25
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
N/A
ATV Maint $150
Design Weight Load:
N/A
UTV Maint $50
$200
NOR-R
*Structure
$630
Engineer
After Cost Share:
Gravel
Permits/Erosion
Asphalt $630
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
0.55 New Sum UTV Maint 0.55
Gates
Variance or
Old Bridge Size: N/A
New Bridge Size
N/A
Exception?
Water Body: N/A
Labor Source:
Contract
ATV Maint $330
Design Weight Load:
N/A
UTV Maint $110
$1,070
Vilas
St Germain – Parking Lot Trail: Vilas County proposes to maintain a new 0.55-
mile ATV/UTV summer trail from Forest Ln to Hwy 155 in St Germain. A portion of
this trail is shared with Snow Trail Corridor 15, with the remaining part connecting to
an ATV trailhead and parking area. The trail is developed and open to ATVs at this
time, but needs an asphalt approach installed at Hwy 155. There are no bridges on
this proposed trail.
$1,070
Motion to
recommend funding
by Dan, 2nd Jim.
Motion Passed.
$630
Vilas
St Germain – Dump Trail: Vilas County proposes to maintain a new 0.25-mile
ATV/UTV summer trail on Snow Trail Corridor 15, from Pedycort Rd to Balsam Dr in
St Germain. This trail will help bring ATVs to downtown St. Germain. The trail is
fully developed and open to ATVs at this time. There are no bridges on this
proposed trail. This request is for new maintenance funds only.
$200
See above
$0
Vilas
Arbor Vitae - Schuman to Wihega: Vilas County proposes to maintain a new 0.8-
mile ATV/UTV summer trail from Schuman Rd to Wihega Rd in Arbor Vitae. This
will connect two routes and complete a loop in the trail system. The trail is currently
under development and all development costs will be paid by the Lakeland ATV
Club. There are no bridges on this proposed trail. This request is for new
maintenance funds only once construction is complete. Should this project receive
funding, it will require a variance for 14-ft width within the DOT Highway corridor.
$640
Motion to
recommend funding
#37 and #38 by
Dave, 2nd Dan.
Motion Passed.
$0
#37
#38
#39
Page 21 of 31
Region County
Component
Costs Total Approved
Question/Answer
2022-2023 ATV NEW SUMMER TRAIL REQUESTS
Description
NOR-R
*Structure
$97,156
Engineer $10,000
After Cost Share:
Gravel $30,000
Permits/Erosion
Materials
Asphalt $7,200
Breaker $23,200
Other funds received, requested, or committed?
Pit Run $13,250
Yes or No:
Yes
Amount: 31,068.00$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
$9,506
New Sum ATV
Mit
7.5 New Sum UTV Maint
7.5
Gates $4,000
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A
Labor Source:
Contract
ATV Maint $4,500
Design Weight Load:
N/A
UTV Maint
$1,500
$72,088
NOR-R
*Structure
$26,450
Engineer
After Cost Share:
Pit Run $18,550
Permits/Erosion
Asphalt $1,800
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
Yes
Amount: 6,100.00$
Labor $1,000
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
$5,100
New Sum ATV
Mit
0.6 New Sum UTV Maint
0.6
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
Contract
ATV Maint $360
Design Weight Load:
N/A
UTV Maint $120
$20,830
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Abutments
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
1.3 New Sum UTV Maint 1.3
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
N/A
ATV Maint $780
Design Weight Load:
N/A
UTV Maint $260
$1,040
Langlade
Wolf River Trail South: Langlade County proposes to maintain a new 1.3-mile
ATV/UTV summer trail, an extension of the Wolf River Trail running south from the
Village of White Lake to CTH P. Other than signs, the trail is developed and ready
for ATVs at this time. There are no bridges on this proposed trail.
$1,040
Motion to
recommend funding
by Dan, 2nd Mike.
Motion Passed.
$0
Vilas
St Germain - Gravel Pit: Vilas County proposes to develop a new 0.6-mile
ATV/UTV summer trail and snowmobile trail for winter to replace the use of Gravel
Pit Rd in St Germain. The County Highway Department will be using the road year
round and has requested the motorized trails be removed from it. Work would
include cutting trees, removing stumps, brushing, grading, and installing a gravel
base in problem areas. Some costs for this project are proposed to be split with
Snow. There are no bridges on this proposed trail.
$20,830
Motion to
recommend funding
by Jim, 2nd Dan.
Motion Passed.
$20,350
Vilas
NHAL Lost Creek to K: Vilas County proposes to develop a new 7.5-mile ATV/UTV
summer trail from Lost Creek Rd to CTH K. The trail will follow existing snowmobile
trails (club trail and Trail 7) and provide a major connection from Sayner to the Star
Lake area. Additionally, CTH K could be opened in this area, connecting the county
system to the east (Landover trails and Torch Lake Campground). Work would
include grading, installing large material in low areas, installing a gravel base in
sandy areas, and armoring portions of hills to prevent erosion. Some costs for this
project are proposed to be split with Snow to rehab the current trail base. There
are no bridges on this proposed trail.
$72,088
Motion to
recommend funding
by Mike, 2nd Dave.
Motion Passed.
$66,088
#40
#41
#42
Page 22 of 31
Region County
Component
Costs Total Approved
Question/Answer
2022-2023 ATV NEW SUMMER TRAIL REQUESTS
Description
NOR-R
*Structure
$46,317
Engineer $13,500
After Cost Share:
Gravel $2,232
Permits/Erosion
Pit Run $149
Black Top $1,095
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor/Equip $29,341
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
0.2 New Sum UTV Maint
0.2
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A
Labor Source:
Contract
ATV Maint $120
Yes
Design Weight Load:
N/A
UTV Maint $40
$46,477
NOR-R
*Structure
$697,018
Engineer $140,000
After Cost Share:
Gravel $131,400
Permits/Erosio
$24,160
Materials $121,950
Abutments
Culverts $520
Other funds received, requested, or committed?
Landscaping $79,508
Yes or No:
No
Amount: -$
Labor $199,480
Public or Private:
Public
Funded seasons:
Summer
Equip Rental
New Sum ATV
Mit
1.1 New Sum UTV Maint
1.1
Gates
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Exception?
Water Body: N/A Labor Source:
Contract
ATV Maint $660
Design Weight Load:
N/A
UTV Maint $220
$697,898
NOR-S
Grading $31,500
$63,997
Gravel $26,983
After Cost Share:
Signage $5,514
Other funds received, requested, or committed?
Yes or No:
No
Amount: -$
Public or Private:
Public
Funded seasons:
Summer
New Sum ATV
Mit
3.5 New Sum UTV Maint 3.5
Old Bridge Size: N/A New Bridge Size
N/A
Water Body: N/A Labor Source:
ATV Maint $2,100
Design Weight Load:
N/A
UTV Maint $700
$66,797
$965,719.74 $201,025.00
FCPC
The Forest County Potawatomi Community (FCPC) proposes to develop a new 1.09-
mile ATV/UTV summer trail running adjacent to State Hwy 8 from Fire Keeper Rd to
the intersection of Bug Lake Rd and Indian Dr. The trail will connect to an existing
ATV trail and services on the west, and a multimodal tunnel near Kwe Da Kik Ln to
allow safe crossing of Hwy 8. Additionally, the trail would provide access to many
community services that border this proposed trail and are open to the general
public. Work would include excavation and installation of new trail, grading and
landscaping of land adjacent. Work would be timed to Hwy 8 construction. There
are no bridges on this proposed trail.
$0
More maps?
Connections to other
trail networks? --
Maps added to
application FCPC
has received a federal
grant offer for this
work. Motion to defer
until such time as
federal funds won't
cover the proposal by
Ed, 2nd Jim. Motion
Passed. Mike
Abstains.
$697,018
Langlade
Hwy 55: Langlade County proposes to develop a new 0.2-mile ATV/UTV summer
trail along the Hwy 55 right-of-way in the Town of Wolf River to connect CTH M and
CTH WW. Work would include cutting trees, removing stumps, brushing, grading,
and installing a gravel base. There are no bridges on this proposed trail. This trail
will require a variance for 14-ft width within the DOT Highway corridor.
$46,477
Motion to
recommend funding
by Dave, 2nd Ed.
Motion Passed. Jim
Abstains.
$46,317
Polk
Sterling ATV/UTV loop development consists of connecting an existing network of
forest roads. Roughly 3.5 miles of connections will be made by brushing/grubbing
new segments of trail, followed by removal of obsructions in the new trail such as
stumps and large rocks and moderate leveling and grading, if needed.
$0
Will these forest
roads then be
closed to other
motor vehicle use?
Need response from
County.
Motion
to defer until info
received by Ed, 2nd
Jim. Motion Passed.
$63,997
#43
#44
#45
Page 23 of 31
Region County Component Costs Total Approved Questions/Answers
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Both
Funded Seasons
Winter
Equip Rental
New Shared Wint. ATV
2.7 New Winter UTV Maint 0
Gates
New Solo Wint. ATV Maint 0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared
$270
Exception?
Water Body: CF Wild Wood Labor Source:
N/A
Winter (Solo) M
$0
Design Weight Load:
N/A
Winter UTV Ma
$0
$270
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Private
Funded Seasons
Winter
Equip Rental
New Shared Wint. ATV
2.5 New Winter UTV Maint 0
Gates
New Solo Wint. ATV Maint 0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared
$250
Exception?
Water Body: N/A Labor Source:
N/A
Winter (Solo) M
$0
Design Weight Load:
N/A
Winter UTV Ma
$0
$250
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Both
Funded Seasons
Winter
Equip Rental
New Shared Wint. ATV
2.74 New Winter UTV Maint 0
Gates
New Solo Wint. ATV Maint 0
Variance or
Old Bridge Size: N/A New Bridge Size
N/A
Winter (Shared
$274
Exception?
Water Body: N/A Labor Source:
N/A
Winter (Solo) M
$0
Design Weight Load:
N/A
Winter UTV Ma
$0
$274
$0
270
Taylor
Taylor County proposes to maintain a new 2.5-mile winter ATV trail just east of Medford,
from Hwy 13 to Hwy 64. The trail would utilize and share the existing M3 snowmobile trail
and requires no additional construction. The trail would not be open to winter UTVs. There
are no bridges on this proposed trail, though it does use one frozen crossing. This request
is for new maintenance funds only.
250
See above
$0
2022-2023 ATV NEW WINTER TRAIL REQUESTS
Description
Taylor
Taylor County proposes to maintain a new 2.7-mile winter ATV trail from the
Taylor/Lincoln County Line to Wildwood Ave in Lincoln County. The trail would utilize
and share the existing Trail 86 snowmobile trail and requires no additional construction.
The trail would not be open to winter UTVs. There are no bridges on this proposed trail.
The trail uses a frozen crossing for the river. This request is for new maintenance funds
only. Both counties support this request.
Motion to recommend funding
#47 and #48 by Ed, 2nd Dave.
Motion Passed
$0
Langlade
Langlade County is requesting Winter ATV maintenance funding for existing trails that are
adjacent to roads. These segments are now eligible for funding consideration due to the
change to the 40-foot rule. Trails are all constructed and do not require additional funds
other than maintenance.
274
Motion to recommend funding
by Mike, 2nd Dan. Motion
Passed
#47
#48
#49
Page 24 of 31
Region County Component Costs Total Approved Questions/Answers
2022-2023 ATV NEW WINTER TRAIL REQUESTS
Description
NOR-R
*Structure
$0
Engineer
After Cost Share:
Gravel
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed?
Riprap
Yes or No:
No
Amount: -$
Labor
Public or Private:
Public
Funded Seasons
Winter
Equip Rental
New Shared Wint. ATV
1.74 New Winter UTV Maint 1.74
Gates
New Solo Wint. ATV Maint 0
Variance or
Old Bridge Size: Road Bridge New Bridge Size
N/A
Winter (Shared
$174
Exception?
Water Body: Brule Labor Source:
N/A
Winter (Solo) M
$0
Design Weight Load:
N/A
Winter UTV Ma
$174
$348
NOR-S
*Structure $80,000
$177,015
Engineer/Perm
$43,000
After Cost Share:
Gravel
Site Prep $2,000
Approaches $2,000
Abutments $20,000
Other funds received, requested, or committed?
Riprap $2,000
Yes or No:
Yes
Amount: 88,507.00$
Labor $10,000
Public or Private:
Private
Funded Seasons
Winter
H&H $12,500
New Shared Wint. ATV
2.9 New Winter UTV Maint 2.9
Wetland Delin $3,000
New Solo Wint. ATV Maint
Misc $2,515
Variance or
Old Bridge Size: 12' x30' New Bridge Size
12' x 80'
Winter (Shared
$290
Exception?
Water Body: Erickson Creek Labor Source:
Winter (Solo) M
$0
10 Design Weight Load:
25,000
Winter UTV Ma
$290
$89,088
$90,230 $90,230 $0
Florence
Florence County proposes to maintain a new 1.74-mile winter ATV trail connecting the
Nicolet State Trail to Corridor 2 in Michigan. The first half of the trail is open to winter ATVs
and UTVs. This request would open the rest of the trail, using and sharing the existing F7A
snowmobile trail and requires no additional construction. There are no bridges on this
proposed trail, other than the road bridge at the state line. This request is for new
maintenance funds only.
348
$0
Motion to recommend funding
by Mike, 2nd Dan. Motion
Passed. Ed Abstains.
Motion to recommend funding
by Jim, 2nd Mike. Motion
Passed
$88,508
Douglas
Trail 3 Development with NEW Bridge. Proposing adding 2.9 miles to the trail network.
Develop a safer crossing of Cranberry Lake Road and reconnect to the existing Trail 3 (2.2
miles already funded Winter ATV). This new section is 800' long and would require
removing trees and stumps shaping the trail, gate installation and signing. Place a new
bridge over Cranberry Creek. Total Est. $178,665.00 Snow
$88,507.50 ATV $88,507.50
89088
#50
#51
Page 25 of 31
Region County Component Costs Total Approved Question/Answer
NER
$1,270
Current Non-Gas Tax Miles
2.9
New Non-Gas Tax Miles
Current Gas Tax Miles
23.7
New Gas Tax Miles
5.1
Variance or
Exception?
Non GT Rds -$
GT Rds 1,269.90$
$1,270
$1,270 $0.00
Motion to NOT
recommend funding
by Ed, 2nd Dave.
Motion Passed. Jim
Abstains.
$1,270
DNR Comments: Does not provide a connection, only expands/extends riding
opportunity. By this logic, all county forest roads that connect to a trail could be
eligible? Not sure this qualifies as fundable.
2022-2023 ATV TROUTE APPLICATIONS
Description
Oconto
Oconto County is requesting troute maintenance funding for 5.1 miles of county forest
roads that connect to the Nicolet Trail. They exit and return to the same trail, creating
a loop system off of the trail. They do not connect trail to a DIFFERENT trail or
service. The county also requested additional funds to sign as route, but not eligible
under NR 64.14 (9)(d)
$0.00
Gas Tax Rate - $249.00
Non-Gas Tax Rate $300
#53
Region County Component Costs Total Approved Questions/Answers
NER
*Structure
$15,000
Engineer
After Cost Share:
Gravel $2,750
Permits/Erosion
Materials
Culverts
Other funds received, requested, or committed? Riprap
Yes or No:
Yes
Amount: 7,500.00$ Labor $5,500
Public or Private:
Public
Funded seasons:
Summer
Equip Rental $6,750
Variance or
Old Bridge Size: New Bridge Size
Gates
Exception?
Water Body: Labor Source:
Years in System: Design Weight Load: $7,500
WCR
*Structure
$181,500
Engineer
After Cost Share:
Gravel
Permits/Erosio
$29,500
Materials $152,000
Culverts
Other funds received, requested, or committed? Riprap
Yes or No:
No
Amount: Labor
Public or Private: Funded seasons:
Equip Rental
Variance or
Old Bridge Size: New Bridge Size
Gates
Exception?
Water Body: Labor Source:
Years in System: Design Weight Load: $181,500
$189,000.00 $189,000.00
2022-2023 ATV INTENSIVE USE AREA REQUESTS (All Non-Maint incl. Dev, Rehab, etc)
Description
$7,500
Motion to recommend
funding by Jim, 2nd
Mike. Motion Passed
$7,500
Kewaunee County prposes to rehab approx 1 mile of trail located behind the parking
and shelter area of the Riverview ATV Park. Work would include grading, shaping
and leveling to repair low spots, ruts damage. Low areas will be spot treated with
gravel. Funding request is split 50/50 with OHM.
Kewaunee
Town of Rome
The Town of Rome is requesting funds to site and secure new trails for the ATV
intensive use area. This 160 acres needs the following items done before additional
trails can be added. Wetland Delineation $15,000, Wetland Mapping $5,000
Archeological Review $1,000, Environmental Review $2,500, Endangered
Resources Review $3,000, Survey Property Lines $3,000, Clearing for fence
$42,000, Fence Installation $110,000
$181,500
Motion to recommend
funding by Jim, 2nd
Mike. Motion Passed
$181,500
#54
#55
Page 27 of 31
Region County Component Costs Total Approved Q & A
NOR-R
Vault Toilet $27,450
$51,900
Engineer
After Cost Share:
Site Work $6,000
$51,900
Septic System
Well/Plumbing
Electrical/lights
Variance or
Other funds received, requested, or committed?
Equip Rental $8,497
Exception?
Yes or No:
No
Amount:
Labor $5,821
Public or Private:
Public
Funded seasons:
Gravel
$2,104
Labor Source:
Contract
Materials $2,028
$51,900
NOR-S
*Structure
$46,542
Engineer
After Cost Share:
Site Work $33,142
$46,542
Septic System
Well/Plumbing
Electrical/lights
Variance or
Other funds received, requested, or committed?
Equip Rental
Exception?
Yes or No:
No
Amount:
-$
Labor $13,400
Public or Private:
Publlic
Funded seasons:
Labor Source:
$46,542
Total $98,442 $98,442
Douglas
Wild Rivers Trail Park and Ride proposed to construct a 80' x 500' park and ride
next to the WRT and County Rd Y in the Town of Gordon.
$46,542
Motion to recommend
funding by Dan, 2nd
Mike. Motion Passed.
$51,900
2022-2023 ATV SUPPORT FACILITY REQUESTS
Description
Langlade
Langlade County proposes to rehab the ATV/UTV trailhead, located on CTH T.
Work will include removal and replacement of the vault toilet, repair of pump house
building, new electric for restroom lights, and gravel for parking. County applied
for but did not receive RTP funds.
Motion to recommend
funding by Mike, 2nd Ed.
Motion Passed.
#56
#13
#13
Page 28 of 31
Proj #
REGION
COUNTY DESCRIPTION TOTAL APPROVED
#57
NOR-S Douglas Douglas Co Summer Map 2022-23 $4,500
$4,500
$4,500 $4,500
2022-2023 ALL-TERRAIN VEHICLE NEW MAP REQUESTS
Page 29 of 31
Region County Component Costs Total Approved Q&A
WCR
Acq Price $7,000
$10,000
Appraisals
After Cost Share:
Survey
Misc Closing $3,000
Variance or
Other funds received, requested, or committed?
Exception?
Yes or No:
No
Amount:
Funded seasons:
$10,000.00
$10,000.00
2022-2023 ALL-TERRAIN VEHICLE ACQUISITION REQUESTS
Description
Purchase 1.9 acres from Adams County. This purchase will make it so the entire 40
acre parcel is owned by the Town of Rome for the Dyracuse Recreational Park.
Adams County has contacted the Town of Rome stating they want to sell the parcel
and the Town of Rome has first rights to it. The parcel number is 030-01033-0010.
If it appraised at $4k,
why asking $7k?
Contingency money
in case the price is
higher Motion to
recommend funding
no more than
$10,000 by Dave,
2nd Dan. MOTION
PASSED
$10,000
$10,000
Town of
Rome
#58
Region County Component Costs Total Approved Q&A
State
Mobile Radios
$15,239
$46,938
Portable Radio
$7,699
After Cost Share:
Repeaters $24,000
Variance or
Other funds received, requested, or committed?
Exception?
Yes or No:
No
Amount:
Funded seasons:
State
Icom IC-SAT
$13,158
$23,307
Speaker Mic $1,305
After Cost Share:
Annual Fee $8,844
Variance or
Other funds received, requested, or committed?
Exception?
Yes or No:
No
Amount:
Funded seasons:
$70,244.60 $0.00
Q&A recorded in
minutes.
$23,307
2022-2023 ALL-TERRAIN VEHICLE COMMUNICATION EQUIPMENT REQUESTS
Description
NOHVIS
NOHVIS is requesting grant funds to purchase 12 motorola VHF radios, 8 portable
radios, and 4 repeaters for the trail ambassador program. The equipment would be
owned by NOHVIS but held and maintained by clubs as follows;
- New London ATV Club - 2 portable and 2 mobile radios.
- White Lake ATV club - 2 portable radios.
- Chippewa Valley ATV club - 2 portable and 2 mobile radios
- Forest Co ATV Club - 2 portable and 2 mobile radios.
The repeaters would be installed at Tigerton, Dyracuse, Sheboygan Communication
Center and in Forest Co.
Application scored 12 points out of a possible 14.
Q&A recorded in
minutes.
.
Motion to defer
#59 and #60
pending further
information by Ed,
2nd by Jim.
Motion Passed.
Mike Abstains.
.
(Previous motion
to fund by Jim,
2nd Ed. Motion
Failed.)
$46,938
NOHVIS
NOHVIS is requesting grant funds to purchase 9 satellite radios for the trail
ambassador program. Application scored 8 points out of a possible 14. The
equipment would be owned by NOHVIS but held and maintained by the New
London ATV Club (2), White Lake ATV Club (2), Chippewa Valley ATV Club (2),
Forest Co ATV Club (2) and Harrison Hills ATV Club (1)
#59
#60